Good news comes from our overseas hydrogen energy project in UZ (Uzbekistan)! Customized for our UZ (Uzbekistan) client, two sets of 6.5Nm³/h alkaline water electrolysis hydrogen generator units have completed the whole process from review, production, commissioning and shipment to on-site installation. In May 2026, the project successfully passed the rigorous inspection by German supervisors and fully completed on-site installation. Approved by American design institute standards and verified by German on-site supervision, this project fully demonstrates the international quality of our hydrogen energy equipment and our strong capability in overseas project implementation.
Complying with International Standards and Passing Strict US Review
Launched in 2025, the UZ (Uzbekistan) hydrogen project is fully designed and planned by a US design institute with strict international industry standards and review specifications. During project implementation, we strictly followed international design parameters, manufacturing processes and quality management standards, and strictly controlled every link of equipment R&D, production and quality inspection. The project successfully passed multiple rounds of special reviews by the US design institute, with all technical solutions and equipment indicators fully meeting international design requirements.
Efficient Performance and Successful Factory Acceptance
Relying on our mature intelligent manufacturing system and efficient project management capabilities, the two sets of 6.5Nm³/h alkaline water electrolysis hydrogen generator units completed full manufacturing on November 19, 2025. Systematic in-plant joint commissioning was carried out immediately, with comprehensive testing on core parameters including hydrogen purity, operational stability, energy consumption and safety interlock system. On November 30, 2025, all operating data reached the standard, and the equipment passed the factory acceptance at one time.
Professional Pre-shipment Preparation and Smooth Export Shipment
To meet the standards of long-distance cross-border transportation, the equipment was professionally packaged with shockproof, rust-proof and reinforcement protection. Complete technical documents, customs declaration materials and inspection reports were fully sorted out. On January 16, 2026, the complete hydrogen generator equipment, control system and supporting accessories were fully prepared and successfully shipped and exported to UZ (Uzbekistan).
Passed German Supervision Inspection and Finished On-site Installation
After the equipment arrived at the project site, our technical team efficiently promoted on-site construction in strict accordance with international construction specifications and safety standards. In May 2026, all installation procedures were completed. The project successfully passed the all-round, high-standard on-site inspection by the German supervision institution. The installation quality and equipment status fully meet the project operation requirements, laying a solid foundation for subsequent commissioning and stable operation.
Deepening Global Layout and Empowering Intelligent Hydrogen Manufacturing
Reviewed by American design institutions and supervised by German on-site inspectors, this UZ (Uzbekistan) project fully proves that our products can adapt to high-standard global market demands. In the future, we will continue to deepen the overseas hydrogen energy market, optimize product quality and overseas engineering service capabilities, expand the global market with high-standard and high-quality hydrogen energy equipment, and contribute to the development of the global green hydrogen industry.



