Project Introduction:
This is a benchmark industrial hydrogen generator project in Widabe, Indonesia, equipped with a 10Nm³/h alkaline water electrolysis hydrogen generator system. The equipment completed overall production on August 1, 2026, passed full-standard factory commissioning and acceptance on August 15, 2026, and was successfully gathered at the port and exported to Indonesia on August 24, 2026 after completing all pre-shipment preparations. With stable performance and strong environmental adaptability, the plant provides high-quality reliable equipment support for overseas industrial green hydrogen applications in Southeast Asia.
1. Project Overview
This is a key hydrogen energy supporting project for industrial production in Widabe, Indonesia, equipped with a 10Nm³/h alkaline water electrolysis hydrogen generator plant. It represents another successful overseas layout of the company in the Southeast Asian hydrogen energy market. Adopting mature and reliable alkaline water electrolysis technology, the complete system consists of a core alkaline electrolyzer, rectifier power supply system, lye circulation system, gas-liquid separation and purification device, full-automatic PLC control system and complete safety interlock protection units. Featuring stable operation, strong adaptability to local working conditions and convenient maintenance, the equipment can fully meet the long-term continuous and standardized high-purity hydrogen generator demands of local industrial scenarios in Indonesia.
2. Key Project Milestones
The project was implemented in strict accordance with international manufacturing standards, factory commissioning specifications and export inspection procedures, with standardized and efficient delivery progress:
• August 1, 2026: Completed the full-process production, assembly and structural inspection of the 10Nm³/h alkaline water electrolysis hydrogen generator plant, finishing all manufacturing work.
• August 15, 2026: Completed in-depth factory joint commissioning, performance testing, air tightness inspection and full-condition trial operation. All Hydrogen generator parameters, energy consumption indicators and safety performances fully met the design standards, achieving qualified data verification and passing internal factory acceptance successfully.
• August 24, 2026: Finished standardized packaging, export document verification, commodity inspection declaration and all pre-shipment preparations. The equipment was successfully gathered at the port and shipped to Indonesia, completing the full overseas delivery phase.
3. Project Value
As a benchmark overseas hydrogen equipment export project in Southeast Asia, this case fully demonstrates the company’s full-chain comprehensive capabilities in standardized manufacturing, complete factory commissioning, systematic quality inspection and turnkey overseas delivery of alkaline Hydrogen generator equipment. The 100% full-performance pre-shipment test greatly reduces on-site commissioning risks and ensures stable overseas operation. The successful delivery further expands the company’s market layout in Southeast Asia, providing mature and reliable domestic complete equipment solutions for industrial green Hydrogen generator and low-carbon transformation in Indonesia and surrounding Southeast Asian regions.