Huaneng Changli HGWE-M250m³/1/6 photovoltaic hydrogen production

ALLFIRST ENERGY SYSTEMS CO.,LTD. and Huaneng Changli Solar Power Co., Ltd. to cooperate in the Huaneng Changli photovoltaic power generation project hydrogen system equipment, our company on schedule to complete the new, advanced technology, mature, complete, designed to meet the technical specifications of the performance of the guaranteed value of the equipment, has been completed in the power plant in Da'an on April 12, 2024 all the installations and to ensure that the equipment safe, reliable, cost-effective and stable operation of the installation, commissioning, commissioning, commercial operation, maintenance of the technical services required.